V2 Composite Solar Spectral Irradiance Data Product Matthew DeLand1, Sergey Marchenko1, Linton Floyd2, Ramaswamy Tiruchirapalli1 1SSAI/NASA 2SSRC GSFC 3rd SIST Science Meeting, Lanham, MD 8-9 May 2018 Introduction • Project goal is to improve and extend composite solar spectral irradiance (SSI) data set created by DeLand and Cebula [2008] (V1). • New irradiance data sets are needed to extend this product from July 2005 to the present. • This presentation will review the development of a new SBUV/2 data set for the V2 composite SSI product. • Examples of the preliminary merged V2 composite SSI product will be shown. • Reconciling different data sets at transition points (both spectral and temporal) is a remaining issue. Timeline of New SSI Data Additional SBUV/2 Irradiance Data • NOAA-16 daily spectra (170-400 nm) cover Mar 2001 – Sep 2007 [+ spring 2008] before significant orbit drift issues appear (shadowing of solar diffuser). • Use same long-term correction approach as applied to NOAA-9 and NOAA-11 in V1 composite SSI data set: – Use UARS SUSIM reference spectra in place of SSBUV flights as absolute reference – Create “Day 1” ratio between NOAA-16 and SUSIM to remove calibration bias – Compare concurrent NOAA-16 observations to reference spectra on selected dates to establish benchmarks for correction – Create smooth fits (wavelength, time) for degradation function to correct SBUV/2 data SUSIM Solar Change Estimates NOAA-16 “Day 1” Ratio vs. SUSIM NOAA-16 Coincident Ratio vs. SUSIM NOAA-16 Degradation Fit – samples NOAA-16 Time Series – 200-205 nm NOAA-16 vs. SUSIM – 200-205 nm NOAA-16 data for composite Structure of V2 Composite SSI Product • Start using NOAA-16 data in March 2005 to help fill SUSIM data gaps near end of mission. • Transition to OMI data in January 2007. • Fill gaps at shorter wavelengths using proxy models and scaled Bremen composite Mg II index. • Fill data for 400-500 nm before OMI? V2 Merged Data – 155 nm V2 Merged Data – 230 nm V2 Merged Data – 310 nm V2 Merged Data – All Wavelengths V2 Transition – Case 1 V2 Transition – Case 2 Next Steps for Project • Resolve offsets at transition locations. • Ensure that interpolation for small gaps is handled correctly. • Determine format for uncertainty estimates. • Provide preliminary composite data set for comments. • Complete manuscript for journal paper.